OEE & Downtime Cost Calculator

Use burdened labor + overhead or bottleneck value.
We will value 1 OEE point over this timeframe.
We will convert minutes to your timeframe using your working days per week.

Planned Production Time

Planned time this week: 0.00 hrs
Month≈4.33 weeks • Quarter≈13 • Year=52

OEE (current vs. target)

Try +1% to see impact immediately.

Downtime Cost

$0
Cost/min: $0  •  Minutes (this period): 0  •  Basis: per selected timeframe

Value of 1 OEE Point

$0
1% of planned time (0.00 hrs) × rate.

Value of Your OEE Change

$0
Δ OEE: 0 pts • Extra productive time: 0.00 hrs

Every 10 min downtime

$0

Every 1 OEE point this week

$0

Cost per minute

$0
0% current • target mark
Benchmarks: 40% poor • 60% fair • 85% world-class
Arc shows current OEE. Tick shows target.
Enter values to see what moved the needle.
Explain It Plain language glossary and one-click scenarios
Glossary of terms
OEE
Overall Equipment Effectiveness. Simple way to see how much planned production time became good product.
Planned production time
Hours you intend to run. Shift length × shifts × working days, sized to your timeframe.
Unplanned downtime
Minutes lost that you did not plan. Breakdowns, outages, cyber events.
1 OEE point
One percent of your planned time. Worth real hours and dollars based on your hourly rate.
Bottleneck rate
The station that sets the pace. Use its burdened $ per hour to value time.
Cost per minute
Your hourly rate divided by 60. Every 10 minutes adds up fast.
CMMS
Maintenance system that schedules work and prevents surprise breakdowns.
Predictive maintenance
Using sensors and data to fix things before they fail.
Cyber outage
Systems down. OEE can drop to zero until you recover or switch to manual.
Scenario explorer
Cyber outage for 1 day
Assumes one full production day down. OEE effectively zero for that day. Shows direct dollars lost at your rate.
RiskDowntime
Adopt CMMS with predictive maintenance
Reduces unplanned downtime by 90 min per week and lifts target OEE by 2 points.
MaintenancePrevention
Add a second shift
Doubles daily planned time. See how the value of 1 OEE point scales and what a small OEE gain is worth.
CapacityScaling
Tip: Use the scenarios to spark a conversation. Owners can see impact without learning formulas first.